Bathtub replacement pros based in Pierz, MN
Pierz has 3 tub replacement pros on record, grouped by trade below. Plumbers are listed first, then bath specialists, alphabetically within each group.
Licenses checked · Minnesota Department of Labor and Industry
63%of homes built before 1980
The bathtubs in Pierz are aging too
Homes built before 1980 make up 63% of the housing in Pierz.
Cast iron was the default tub material for most of that era in Pierz, part of why so many older bathrooms still have one.
Our materials guide covers what a cast iron tub weighs before Pierz homeowners plan its replacement.
23.2%of residents are 65 or older
How long Pierz's tub pros have held their license
The oldest license among Pierz's listed pros goes back to 2012.
Across Pierz's group, the median time licensed comes to 15 years.
67% of Pierz's pros have held it for a decade or more, meaning they have renewed at least once.
Tub replacement pros based in Pierz, by trade
Grouped by trade, plumbers then bath specialists, A to Z within each group. Not a ranking.
Plumbing contractor (3)
Do It All Plumbing & Heating
Plumbing contractor
- License
- Plumbing Contractor · PC782790
- Since
- 2021
- Expires
- Dec 31, 2027
- ZIP
- 56364
Lochner Plumbing INC
Plumbing contractor
- License
- Plumbing Contractor · PC644836
- Since
- 2012
- Expires
- Dec 31, 2027
- ZIP
- 56364
Northwoods Plumbing INC
Plumbing contractor
- License
- Plumbing Contractor · PC644397
- Since
- 2012
- Expires
- Dec 31, 2027
- ZIP
- 56364
Questions before you swap a tub
- Is this a like-for-like swap, or does the drain move, and does that change whether we need a permit?
- Which of your licenses covers this: plumbing, or a remodeling license, or both?
- What does the new tub weigh, and does the floor underneath need any reinforcement?
- Was this house built before 1978, and if so, how are you handling any painted surfaces you disturb?
- Are you reusing the existing drain and overflow, or replacing that hardware too?
- What is the real difference in your price between refinishing, a liner, and a full replacement?